Hello, Welcome Dongguan Zhonglong Pump Technology Co. Ltd!
Product Categories
Contact us

Hotline:
0086-769-8601-0360

Fax:0086-769-8180-2808
Business Contacts:
Mr. Huang: 0086-133-1667-5312
Domestic business:
E-mail: sales@zldcpump.com
Business and technical support:
Mr. Huang: 0086-133-3268-3563
E-mail: rd@zldcpump.com
Mr. Huang: 0086-132-3837-9488
E-mail: complaint@zldcpump.com
Zip code: 523290
Address: Zhonglong Pump Industry, 2nd Floor, No. 10 Hengling Street, Hengjiao, Shijie Town, Dongguan City

Company news
Your current location is:home> News> Company news

Selection and piping requirements of water pump on pipeline

Release time:2020-02-21 14:40:20  Browse times:

In order to improve the suction performance of the pump, the suction pipeline of the pipeline pump should be shortened as much as possible, and the bends should be minimized (the elbow is better to use a large curvature radius), so as to reduce the resistance loss of the pipeline. In order to prevent the pump from generating steam pipe, the suction pipe of the pump shall be shortened as much as possible

Last article:Corrosion resistance table of conventional rubber materials Last article:Last article